Live Operations

Scheduled cleaning for live data halls and technical spaces.

Shutting down is rarely an option. Our technicians are trained to work in live environments, around running equipment, without causing downtime. We plan every programme around your site’s procedures, permits and maintenance windows.

Who it’s for

$

Data centre operators: enterprise, colocation and hyperscale

$

FM providers managing technical estates

$

Organisations with on-site server and comms rooms

Why it matters

Dust and particles build up in data halls, under raised floors and on cable trays. Left alone, they restrict airflow, push up equipment temperatures and raise the risk of failure. Planned cleaning removes contamination instead of moving it around.

What’s included

$

Data hall cleaning

$

Raised floor and subfloor void cleaning

$

Cabinet and rack exteriors, containment systems

$

High-level cleaning: ceilings, cable trays, lighting and ductwork

$

Anti-static cleaning

$

Contamination control

$

Epoxy and technical floor care

$

Building fabric cleaning in technical areas

$

Air particle testing

Data centres

Programmes for live data halls, run daily, weekly or periodically and built into your maintenance schedule.

Server rooms

The same standards for on-site server rooms. One-off deep cleans or a scheduled programme, with minimal disruption.

Comms rooms

Network, telecoms, MDF and IDF rooms. We clean around patch panels, switches and cabinets without disrupting the network.

IT equipment

External surfaces of cabinets, racks, workstations and peripherals, cleaned with anti-static methods.

Anti-static cleaning

Anti-static materials and methods that remove dust while limiting static build-up and discharge risk around sensitive electronics.

How we work

L

Site induction, method statements and risk assessments (RAMS) and permits agreed before we start

L

HEPA-filtered vacuums, microfibre, anti-static materials and low-particle methods

L

Cleaning to ISO 14644-1 where required

L

Work recorded and visible to you in One Hub

L

Work planned around your change windows and site rules

Case Study

one Live Operations case study: client or site type, the problem, what C4 did, the